Ballarat Terminal Station -
Battery Energy Storage System
Peracon successfully completed the detailed design of the electrical, SCADA and protection systems for the first utility scale grid connected 30MW /30MWh Ballarat Energy Storage System (BESS) in Victoria. We integrated the BESS into the AusNet Ballarat Terminal Station (BATS), by also completing the separate design package of the primary, secondary and civil/structural design on the existing Ballarat site. Our scope included:
Primary design
Secondary design
Structural design for the Ausnet site
Protection philosophy
Relay configuration files
On site commissioning of SCADA and protection relays.