Karratha Temporary Generation
Client: Parsons Brinkerhoff
A 20 MW gas turbine was installed adjacent to the Karratha Terminal Station to support the Horizon Power North West Interconnected System.
In a tight time frame Peracon assisted with the design of a short section of 132 kV line and a 132 kV bay including associated protection and structures.